It took 4 trucks and 3 hrs, but it's done now. Our tower sits on a 15 x 15 x 5 pad and this time lapse shows the countless efforts to pour the 39Yards of concrete required to fill the base.
Our 120' Rohn SSV Sits on a 15x15x5 pad and we had to install 2 mats of re-bar. This video shows the last half of the re-bar work and the installation of the template and foot bolts.